Handover & Quality Check
After weeks of planning, construction, and coordination, the final handover is the moment everything comes together. At Iroko Interiors, we treat this phase with the utmost importance—because true quality isn’t assumed, it’s verified.
Our structured handover and quality check process ensures that every inch of your space has been inspected, tested, and approved—so you receive a home or office that’s not only visually stunning but functionally flawless.
We don’t just “finish” the project—we certify it.
Carpentry & Joinery Check
We inspect shutter alignment, gap uniformity, smooth opening/closing, and edge banding for precision. All hinges, channels, and handles are tested for smooth operation.
Hardware & Fittings Verification
Hettich, Hafele, or equivalent hardware is checked for proper installation, durability, and soft-close functionality.
Surface Finish Inspection
Walls, false ceilings, and painted surfaces are examined for cracks, bubbles, streaks, or dust particles. POP joints are checked for smoothness.
Electrical System Testing
All sockets, switches, and lighting points are tested for power, grounding, and correct circuit labeling. We verify that concealed wiring is safe and functional.
Plumbing & Sanitary Check
Water flow, drainage gradient, and joint integrity are tested in kitchens, bathrooms, and utility areas. No leaks, no blockages.
Modular Unit Functionality
Kitchen trolleys, pull-out trays, wardrobe partitions, and adjustable shelves are operated multiple times to ensure long-term reliability.
Door & Drawer Operation
All sliding, folding, and hinged doors are tested for smooth movement, proper alignment, and auto-closure (where applicable).
Wall & Floor Integrity
Tiles, flooring, and wall panels are checked for levelness, gaps, scratches, or uneven joints.
Final Cleaning & Detailing
We conduct a deep clean—removing construction dust, fingerprints, and protective films—so your space shines on day one.
Client Walkthrough & Feedback
You’re invited for a final site walkthrough with your project manager. We go room by room, using a digital checklist to record any observations or minor touch-ups.
Punch List & Immediate Rectification
Any minor issues noted are added to a punch list and resolved within 24–48 hours, followed by a re-inspection.
Handover Documentation
You receive a complete handover kit including:
• Warranty cards for materials and hardware
• Maintenance guide for laminates, shutters, and finishes
• Electrical layout diagram
• Appliance manuals (if provided)
• Final invoice and project completion certificate
Delivered with Pride & Precision
This meticulous process ensures that your interior is not just “done” — it’s delivered with pride and precision.
As a trusted turnkey interior company in Hyderabad, we believe the last impression is the most lasting. And we make sure it’s perfect.